Updated 2026-08-21 · Metasun buyer guidance
1. Define the requirement
Start with the room type, floor area, preferred plank length, color direction and installation pattern.
2. Verify the details
Review several product faces together because wood-look tile needs controlled variation across the installed floor.
3. Confirm before commitment
Match the final product code to current thickness, packing data, MOQ, sample availability and technical documents before quotation.
Metasun commercial reference
Standard reference: MOQ 1,000 sqm. One tile sample is free and international shipping is paid by the customer. Standard lead time is 25-35 days after order details and production are confirmed.
For a useful reply, include the selected product reference, size, finish, estimated quantity, destination country or port and intended application. Final availability, packing, technical data, price and delivery terms are confirmed for the selected SKU.
This guide is general procurement information. Final product suitability, compliance, price and commercial terms require project-specific confirmation.
View related page